Skip to content
Solar-Garden-Preliminary-Environmental-Survey
Environmental compliance for energy storage

Solar Garden Preliminary Environmental Information Survey

Client: Sunwise Solar, Inc.

Location: Granby, Colorado

Project Type: Environmental Regulatory Compliance

Services:

  • Preliminary Environmental Information Survey for USDA REAP (Rural Energy for America Program Renewable Energy Systems and Energy Efficiency) Grant Compliance
  • Colorado Archaeology and Historic Preservation Compliance
  • Special-Status Species Review
  • Wetland, Water Quality and Flood Hazard Review

Summary:

An environmental review was prepared and revised to meet the requirements of an environmental survey component to qualify for grant funds from the USDA REAP grant program. The elements of this environmental review prepared by Blue Mountain Environmental Consulting were provided in accordance with the Guide to Applicants for Preparing Environmental Reports (RD Instruction 1970-B, Exhibit C) and included Colorado Archaeology and Historic Preservation Compliance, special-status species review, wetland, water quality and flood hazard review.

The solar and battery storage system at the subject property resulted in a ground-mounted solar installation of 1,400 square feet including a 35.4-kilowatt (kW) combination ground and roof-mounted solar photo-voltaic (PV) array, 164 kilowatt-hour (kWh) lithium battery storage system, 84 kW output capacity DC/AC power inverter system, and 600-Amp AC electrical switchgear distribution system.