

Poudre River Restoration
Client: City of Ft. Collins
Location: Larimer County, Colorado
Project Type: Wetland Ecology
Services:
- Installation of Bio-technical Stream Stabilization Practices
Summary:
Blue Mountain aided Colorado Erosion Control in the implementation of biotechnical stream stabilization practices on the Poudre River in Fort Collins, Colorado.
Restoration practices were designed to stabilize slopes and create a range of vegetative communities between the river’s edge and adjacent uplands. The project incorporated three vegetative zones, each with specific seed mixes and erosion control practices that were based on slope and proximity to flowing water. Coyote willow stands were established along the stream corridor; live stakes were harvested from natural stands in the area prior to leaf germination in the spring. These stems were subsequently chilled and soaked in water for several days. Habitat trees (snags) were also incorporated into the final restoration.
Site restoration incorporated three vegetative zones along the river’s edge. A variety of erosion control blankets were used based on slope and proximity to flowing water.