North Taft Hill Road Solar Farm
Client: Bella Energy
Location: Fort Collins, Colorado
Project Type: Environmental Regulatory Compliance
Services:
- City of Ft. Collins Ecological Characterization Study
- Phase 1 Environmental Assessment
- Wetland Compliance
Summary:
Blue Mountain Environmental Consulting assisted Bella Energy with environmental compliance needs for a proposed solar array to be constructed on the northeast corner of North Taft Hill Road and Laporte Avenue in Ft. Collins, Colorado. The project was comprised of approximately 1,000 kW DC of solar modules mounted on racks supported by a driven pile foundation system.
An Ecological Characterization Study conforming to Section 3.4.1 (D)(1) of the Land Use Code of the City of Fort Collins was required by the City of Fort Collins Community Development and Neighborhood Services because portions of the project lie within 500 feet of features identified on the City of Ft. Collins Natural Habitat and Features Map.
A Phase 1 Environmental Site Assessment was prepared in accordance with the American Society of Testing and Materials (ASTM) Standard Practice for Environmental Site Assessments: Phase 1 Environmental Site Assessment Process (ASTM Designation: E1527-13) to support a real estate transaction between the Property’s owners and Bella Energy.
A wetland review and Army Corps of Engineers correspondence was also provided.